All transcripts, headlines, and summaries are automatically generated by AI from live dispatch audio. These alerts are not an official report. Alerts are based on unconfirmed dispatch communications that may change as situations develop. Review the original audio and verify details with official sources before relying on this information.
Dispatch audio
Heard on: WMATA MetroRail · 1/16/2026 10:23 AM
00:13
AI transcript
00:00
Affirmative, tracking to (number withheld).
00:02
All personnel and equipment are clear of the roadway.
AI summaryDiscussions
AI summary
Roadway inspection completed at Woodley Park
Please note:
This is not an official report. The headline and summary are generated by automated AI systems from public-safety dispatch audio. Always verify with official sources.
As discussed during the dispatch call, track and transportation personnel confirmed the area was clear after a roadway inspection at Woodley Park in Washington, DC. The roadway was reopened with a recorded clearance time of 1:23 p.m. No injuries or hazards were reported.