Train slows due to broken brake pipe in Vail


Audio|Source: Union Pacific Lordsburg Sub: Tucson - Vail, AZ Area
01:23
Transcript:
they're still working on it. I haven't heard anything about 1015. All right, here we go. Form and Stafford, gang, number RP 24, use it 1-1B trackball, and today's date 8-1-20205. Form number 606-0-5. All right, copy that, yep. Let me know if you get any update, please. What's the, what's the, exactly? Well, we had a bad up a broken brake pipe over. They have to do a run around those on a on that car. Zero West. Maypass Red bike. Copy that. All right, thank you. You bet. I know something. I'll let you know. Over. Your maximum off the speed. Sweet, thanks. Spego. Setting whistle and bell, we're approaching pasting minute equipment. Acknowledge over. U.P. Detector. Milepost, 997.9.9. Crack T, no defect, total axle, three, eight, zero, frame speed, five, four, MPAH, temperature, one, zero, two degrees. Retector out.
Disclaimer:
This was transcribed by AI and may contain errors. Please verify the information independently.
Location mentioned:
Vail, AZ 85641
Correct
Incorrect