Open in App
audio iconElectrical Hazard - detroit

Wires Arcing Incident at Church – DTE Response Requested

Source: Detroit Fire
Eaton Ave, Detroit, MI, USA
Summary: Fire department units responded to a report of electrical wires up and arcing, posing a hazard at or near a church in Wayne County, Michigan. The situation required the utility company DTE to be dispatched to the scene to address the electrical danger. No members of the public were present at the time, and fire units prepared to leave the scene after confirming DTE's arrival.
  1. DTE Arrives On Scene
    00:08

    Auto-Generated Transcript
  2. Situation Update – DTE Needed
    00:06

    Auto-Generated Transcript
  3. Fire Units Prepare to Leave
    00:04

    Auto-Generated Transcript
  4. No Public Present
    00:03

    Auto-Generated Transcript
  5. Request for Utility Company (DTE)
    00:02

    Auto-Generated Transcript
  6. Initial Report of Wires Arcing
    00:04

    Auto-Generated Transcript
Wires Arcing Incident at Church – DTE Response Requested, detroit | CrimeRadar