Bus stop closed for construction near First and Springfield
Heard on: Santa Clara CA Transportation Group Calls
01:13
00:00
This is block number (number withheld) .
Not official report. AI-generated from public dispatch audio. Always verify with official sources.
A bus operator reports that a coach stop on southbound First near Springfield is closed due to construction. The cement pad and walkway have been removed, and a large dump truck and loader are blocking the area while crews prepare to pour new cement. Passengers are being picked up and dropped off at nearby temporary locations, and other drivers are advised to use caution when serving this stop.
Help the community verify
Is the summary accurate?
Accurate
Unclear
Is this activity real?
Confirmed
False alarm