Painting work with traffic control on Woodcroft Parkway


The audio reports painting work at Home Place 2 on Woodcroft Parkway. It says traffic control is in place and engine units and personnel will be assigned to operations.
Audio|Source: Durham City Fire
00:28
Transcript:
Uncudges for painting, home place 2, 300, Woodcroft, (name withheld), Cross of Nutry Way and St. Child's Drive. Engine 6. (name withheld) will be on Ops 4 and Woodcroft are going to be on Ops General 5.
Disclaimer:
This was transcribed by AI and may contain errors. Please verify the information independently.
Location mentioned:
Near W Woodcroft Pkwy, Durham, NC 27713
Correct
Incorrect