Malfunction causes false alarms at East Main Street crossing, Bridgeport AL


An automatic warning device at the East Main Street railroad crossing is malfunctioning and causing false partial activations of the crossing signals.
Audio|Source: Bridgeport CSX and NS Railroad
01:12
Transcript:
00:00
false partial activation count out of that gray crossing warning device valve function at East Main Street.
00:12
Road crossings at the milepost,
00:15
OOG 81.9 on all tracks, no one of flat row.
00:23
All right, I got EC1 number (number withheld).
00:30
Today's (number withheld), location J-124.0.3. Train ID, M516,
00:36
23, engine (number withheld), Davis on the copy, Circle Line 5.8. Got a 25 mile power on the main track between milepost J-108.2 to the J-108.3. No on the signs.
00:49
Circleline 5.8. Got a 25 mile power on the main track, between milepost J-106.5 to the J-106.6.
00:57
No, on the signs,
00:59
circle line 6B.
01:01
Got a false partial activation account, automatic grade crossing, warning device malfunction,
01:06
at East Main Street, road crossing at milepost J 81.9 on all tracks, no on the flagger.
Disclaimer:
This transcript was automatically generated and may contain inaccuracies. Please verify the information independently.
Location mentioned:
Bridgeport, AL 35740
This shows a Google Street View of the area near the location, which might not be the exact address.
Correct
Incorrect