One lane reopened in Ted Williams Tunnel
Heard on: Worcester MA Interop Group Calls
00:05
Sir, one lane open in the Ted Williams tunnel no longer being diverted through the Sumner.
Not official report. AI-generated from public dispatch audio. Always verify with official sources.
As discussed during the dispatch call, traffic through the Ted Williams Tunnel has resumed with one lane reopened. Vehicles are no longer being routed through the Sumner Tunnel. Situation appears stabilized with normal flow resuming.
Help the community verify
Is the summary accurate?
Accurate
Unclear
Is this activity real?
Confirmed
False alarm